Work is being done to repair damaged Beaver Dock. Columbia Pacific Bio-Refinery has a derrick barge inside the dock driving pile and setting pipe. Anticipate project to last through the end of February 2024.
Current plan is daylight only, M-F. This may change depending on schedule changes. There may also be a second barge and divers at times.